This building section is for a 4 story wood structure over a 1 story concrete podium deck for a hotel.  This section is taken at the porte cochere connecting to the hotel tower.  Shows a typical 1 hour floor and ceiling assembly per UL 528 on floors.

Add to wish list

You must log in to submit a review.